Malaysia
Malaysia
Singapore
Indonesia
Brunei
India
+603-2276 1881 SynergenOG Sdn Bhd
+65 861 84 148 Synergen Oil & Gas Pte. Ltd
+62 2150 897100 PT. SynergenOG Indonesia
+673 233 9270 SynergenOG (B) Sdn. Bhd.

Category

Integrated Risk Management
FPSO risk assessment
Which Safety Studies Does an FPSO Project Need? FPSO safety studies typically progress from broad hazard identification and concept risk screening to detailed hazard analysis, quantitative risk assessment, fire and explosion assessment, safeguard verification and operational readiness. Depending on project stage, design maturity, regulatory regime and risk profile, the programme may include HAZID, HAZOP, QRA, FERA,...
Continue Reading
A graphic of integrated risk assessment Articles
The development of a quantitative risk assessment (QRA) study is an important pre-requisite of any oil and gas facility. Thong Wee Jun and Rachael Tee, Senior Engineers with Malaysia-based Synergen, explain why these should be integrated between multiple facilities located in the same industrial area to provide a more accurate representation of risk exposure. Worldwide,...
Continue Reading
Happy to Help !