Malaysia
Malaysia
Singapore
Abu Dhabi - UAE
Indonesia
UK
Brunei
India
+603 2380 4560 SynergenOG Sdn Bhd
+65 861 84 148 Synergen Oil & Gas Pte. Ltd
+971 56 232 5400 SynergenOG
+62 2150 897100 PT. SynergenOG Indonesia
+44 1224 618460 Synergen Oil & Gas UK Limited
+673 233 9270 SynergenOG (B) Sdn. Bhd.
+91 9995457949 Synergen Energy LLP

Repsol Sinopec Shuts Down North Sea Platforms Due to Pipeline Repairs

In Claymore offshore platform located in the UK North Sea, the production has been temporarily shut down. Repair work is being carried out by the operator Repsol Sinopec Resources UK on the valve of the export pipeline from the platform to the onshore Flotta terminal in Scotland.

There was a reported leaking of the hydraulic fluid from the valve.

According to a spokesman from Repsol Sinopec Resources UK, the repairs will be carried out from Claymore to Flotta terminal to solve the valve issue on the main export.

Source: Oil and Gas People

About the author

Happy to Help !