Malaysia
Malaysia
Singapore
Abu Dhabi - UAE
Indonesia
UK
Brunei
+603 2380 4560 SynergenOG Sdn Bhd
+65 861 84 148 Synergen Oil & Gas Pte. Ltd
0097126772666 GHRDC - SynergenOG
+62 2150 897100 PT. SynergenOG Indonesia
+44 1224 618460 Synergen Oil & Gas UK Limited
+673-233 9270 SynergenOG (B) Sdn. Bhd.

What is MOC compliance?

The MOC section of the PSM standard requires the employer to develop and implement written procedures to manage changes. The procedure should include descriptions of the technical basis for the change, impact on safety and health, modifications to operating procedures, the time period necessary for the change, and appropriate authorizations. Any employee who will be affected by the change must be informed and appropriately trained.

About the author

Happy to Help !