Malaysia
Malaysia
Singapore
Abu Dhabi - UAE
Indonesia
UK
Brunei
India
+603 2380 4560 SynergenOG Sdn Bhd
+65 861 84 148 Synergen Oil & Gas Pte. Ltd
+971 56 232 5400 SynergenOG
+62 2150 897100 PT. SynergenOG Indonesia
+44 1224 618460 Synergen Oil & Gas UK Limited
+673 233 9270 SynergenOG (B) Sdn. Bhd.
+91 9995457949 Synergen Energy LLP
The COMOPS/SIMOPS workshop being conducted by SynergenOG

SIMOPS / COMOPS Workshop

The upcoming field installation activities for Sao Vang Central Processing Platform (SV CPP) commencing from April 2020 are envisaged to involve multiple vessels/ facilities performing activities under Combined Operations (COMOPS). The SIMOPS / COMOPS workshop was conducted to systematically examine and identify potential hazards and their impact on other activities ongoing at the same time. In addition, this workshop was conducted to identify causes, potential consequences, safeguards / control measures that are in place or need to be implemented to eliminate/ mitigate the issue.

About the author

Happy to Help !