The upcoming field installation activities for Sao Vang Central Processing Platform (SV CPP) commencing from April 2020 are envisaged to involve multiple vessels/ facilities performing activities under Combined Operations (COMOPS). The SIMOPS / COMOPS workshop was conducted to systematically examine and identify potential hazards and their impact on other activities ongoing at the same time....Continue Reading
A Hazard and Operability study (HAZOP), the structured and systematic study of an intricate operation, whether existing or fore-planned, to recognise and evaluate the risks and hazards that may endanger the personnel or equipment. SynergenOG conducted a HAZOP workshop for PT JGC Indonesia, a subsidiary of Japan Gas Corporation, providing Engineering, Procurement, Commissioning and Installation...Continue Reading
The Performance Standards of an organisation is the establishment’s targets and goals to improve public health practice. There are various ways to implement such standards based on guidelines or a leader’s expectations. SynergenOG recently visited Vietnam to conduct an Operations Performance Standards (PS) Workshop. The participants comprised of Operations personnel working for an IGPV SV...Continue Reading