Malaysia
Malaysia
Singapore
Abu Dhabi - UAE
Indonesia
UK
Brunei
India
+603 2380 4560 SynergenOG Sdn Bhd
+65 861 84 148 Synergen Oil & Gas Pte. Ltd
+971 56 232 5400 SynergenOG
+62 2150 897100 PT. SynergenOG Indonesia
+44 1224 618460 Synergen Oil & Gas UK Limited
+673 233 9270 SynergenOG (B) Sdn. Bhd.
+91 9995457949 Synergen Energy LLP
alarp demonstration

ALARP Assessment

The ALARP (AS LOW AS REASONABLY PRACTICABLE) Demonstration is a critical step in the projects. It involves a thorough review of risk assessments conducted for the project to identify key risk drivers and potential design measures for risk reduction. The objective is to evaluate the acceptability of existing design measures and propose additional risk reduction measures for specific Major Accident Events (MAEs).

ALARP Assessment and Enhancement   

  • Detailed analysis of existing design measures     
  • Identification of key risk drivers
  • Proposing additional risk reduction strategies  
  • Cost-benefit analysis for undecided measures

Delta PLL Calculation

  • Precise determination of risk reduction effectiveness
  • Data-driven insights for decision-making
  • Ensuring optimal safety measures

Incurred Cost for Averting a Fatality (ICAF) Assessment

  • Quantifying cost-effectiveness
  • Minimizing project risks within budget constraints
  • Achieving the highest level of safety at the best value

SynergenOG ALARP Demonstration: Minimizing Risks, Maximizing Safety

Key Considerations

At SynergenOG, we offer a wide range of services designed to enhance your ALARP Demonstration process. Our team of experts ensures that every aspect of risk assessment is thoroughly evaluated, reducing potential hazards and optimizing safety measures.

During the ALARP Demonstration, workshop participants engaged in a brainstorming exercise to determine the feasibility and effectiveness of various risk reduction measures. In cases where a definitive decision cannot be made, a cost-benefit analysis may be conducted. This analysis, at the discretion of the workshop participants, involves calculating the delta PLL (potential loss of life) and quantifying the cost-effectiveness by calculating the Incurred Cost for Averting a Fatality (ICAF).

Our Approach

  1. Thorough Risk Assessment Review: We meticulously review all risk assessments conducted for your project to identify potential risk reduction opportunities.
  2. Brainstorming for Acceptability: Our ALARP Demonstration is a collaborative exercise where we evaluate the acceptability of existing design measures and brainstorm additional risk reduction measures for specific Major Accident Events (MAE).
  3. Cost-Benefit Analysis: When there’s uncertainty regarding the feasibility of certain risk reduction measures, we offer the option of conducting a cost-benefit analysis. This analysis includes calculating delta PLL (Potential Loss of Life) and quantifying cost-effectiveness by determining the Incurred Cost for Averting a Fatality (ICAF).

Choose SynergenOG for an ALARP Demonstration that takes your safety to the next level.

Happy to Help !