The MLS Project was a project investment led by TOTAL involving installation of a new wellhead platform MLJ3, installation of new pipeline and some brownfield modification.
SynergenOG was appointed to conduct amalgamation of 4 existing Technological Risk Assessment to evaluate the overall risk profile and identify the top risk contributors. In addition, SOG also conducted an Integrated Risk Contour Assessment, looking at the hazardous events presents within the Lumut-Liang Industrial Area (Brunei LNG Sdn. Bhd Liquefied Natural Gas Plant, TOTAL Onshore Processing Plant and Brunei Methanol Company Plant).