MALAYSIA
MALAYSIA
INDONESIA
UK
MYANMAR
SINGAPORE
+603 2380 4560 SynergenOG Sdn Bhd, Kuala Lumpur
+62 21 22983692 PT SynergenOG, Jakarta
+44 1224 641825 Synergen Oil & Gas (UK) Ltd, Aberdeen
+951 566856 SynergenOG Myanmar Company Limited, Yangon
+6341 7882 Synergen Oil & Gas Pte Ltd, Singapore
Certified
ISO 9001 with UKAS
Certified
ISO 14001 with UKAS
Certified
ISO 18001 with UKAS
Get A Quote

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

Project Photograph of an oil rig in the sea.
The image shown here is a representation of the project and not the actual project itself. Actual images of the project would be the intellectual property of the client and hence can’t be shown. 
ClientSu Tu Trang
ExpertiseSafety Assessments

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

The development of Su Tu Trang started in September 2012 with the Long term Production Testing Phase (LTPTP). It consists of a remote, unmanned wellhead platform (WHP-C) that produces to and is controlled from the Su Tu Vang CPP. The Phase 1 STT Project consists of the installation of a reinjection platform (ST-PIP) bridge-linked to the existing WHP-C, the drilling of two new wells on ST-PIP (one injector/producer well (two modes operation) and one producer well) and the conversion from producers into injectors of one existing well on WHP-C.

SynergenOG has performed various safety assessments such as Nosie study, Acoustic Vibration Study, Temporary Refuge Impairment analysis and more.