Rosneft Vietnam B.V. is the operator of the existing Block 06.1 Lan Tay platform that feeds gas through the Nam Con Son Pipeline (NCSP) to the Dinh Co Gas Processing Terminal in Southern Vietnam. The PLD Field development includes development of 2-off subsea wells, whereby well production from the two (2) wells will commingle and flow through a common flowline (20km) to the Lan Tay (LT) Manifold where it will be tied back to the LT Platform.
SynergenOG was responsible for conducting safety reviews i.e HAZID, HAZOP, SIL, Well Start-up Procedure review and various formal safety assessment from FEED through to Engineering, Procurement, and Construction Management (EPCM).