Malaysia
Malaysia
Singapore
Myanmar
Indonesia
UK
Brunei
+603 2380 4560 SynergenOG Sdn Bhd
+65 861 84 148 Synergen Oil & Gas Pte. Ltd
+959793536961 / +60163222218 SynergenOG Myanmar Co.
+62 2150 897100 PT. SynergenOG Indonesia
+44 1224 618460 Synergen Oil & Gas UK Limited
+673-233 9270 SynergenOG (B) Sdn. Bhd.
Certified
ISO 9001 with UKAS
Certified
ISO 14001 with UKAS
Certified
OHSAS 18001 with UKAS
Ask Me More

SIMOPS / COMOPS Workshop

The upcoming field installation activities for Sao Vang Central Processing Platform (SV CPP) commencing from April 2020 are envisaged to involve multiple vessels/ facilities performing activities under Combined Operations (COMOPS). The SIMOPS / COMOPS workshop was conducted to systematically examine and identify potential hazards and their impact on other activities ongoing at the same time. In addition, this workshop was conducted to identify causes, potential consequences, safeguards / control measures that are in place or need to be implemented to eliminate/ mitigate the issue.

About the author